Freeport sits in southern Brazoria County near the mouth of the Brazos River, at an elevation of about 5 feet. The river did not always reach the Gulf where it does today. Silt kept filling the harbor, so a diversion channel completed in September 1929 moved the live Brazos to a new course. The old channel, now the Old Brazos River, became the working harbor of Port Freeport. In 2003 the city also annexed about 3.5 miles of Bryan Beach between Quintana and the river mouth.
That mix gives Freeport very different shorelines within a few miles. Calm harbor and old-river frontage sits close to a live river carrying sediment and flood flows, and open Gulf beach lies just beyond. River current scours around piles and the ends of walls, while ship and workboat wakes in busy channels keep moored structures moving. Low ground means high water reaches structures quickly when storms push in.
We work as Marine Contractors in Freeport, TX on bulkheads, seawalls and retaining walls, and on piers, docks and boat slips built on driven marine pilings. Repair and maintenance of existing waterfront structures is part of the work too, from replacing split piles to rebuilding sagging decks.
Tell us which water your property faces and send a few photos. Expect a free preliminary estimate after we look them over.






More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


The Old Brazos is the former river channel that the 1929 diversion turned into harbor. On harbor water, wakes from boat and ship traffic are often the main load on a dock or wall.
Current scours sediment around pilings and wall ends. We set pilings deeper and protect wall toes where flow is strong.
Yes. We size slips for your boat and set pilings to handle wake and current at your site.
Often yes. Depending on the cause, we add tiebacks, replace failed sections or rebuild the wall.
Your address, the waterway your lot faces and photos of the shoreline. Your free preliminary estimate for the Freeport project is sent once we review them.