Buffalo Bayou starts near Katy, where Willow Fork meets Cane Island Branch, and runs about 53 miles east to the Houston Ship Channel. On the way it passes Memorial Park, the Memorial Villages and Bayou Bend, then Buffalo Bayou Park and downtown, picking up White Oak Bayou near Allen's Landing. Through the Memorial Villages most of the banks are private backyards.
The bayou is a flood channel first. Its watershed is flat with fairly impervious soils, so storm runoff arrives fast. During Hurricane Harvey in 2017 the bayou hit record levels, beating earlier flood crests by several feet. Downstream of a point just west of the Shepherd Drive bridge it is a tidal river. A 620-foot section of the north bank washed out in that event and later needed rip-rap and steel reinforcement to rebuild. Afterward, residents reported backyard terraces west of Shepherd gone. Long, high flows soak and undercut banks, which is when steep slopes tend to slump.
We rebuild failing banks with bulkheads, seawalls and retaining walls, drive pilings where soft ground needs support, and add piers, small docks and boat slips for paddlers. Our Shoreline Construction in Buffalo Bayou, TX also covers repair of older walls that have shifted after high water.
Send the property address and photos of the bank from the water side if you can. We will come back with a free preliminary estimate.






More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


High, long-lasting flows saturate the soil and cut at the base of the slope. Once the toe goes, the upper bank slumps. A wall with proper footing and drainage stops that cycle.
Often yes. We plan equipment access through the yard or from the water and size the method to what the site allows.
It depends on height and how close the water reaches. Lower walls up the slope can work, while the waterline usually needs a bulkhead or seawall with toe protection.
Yes, small docks and landings sized for paddle craft and light boats, set on pilings that tolerate rising water.
Send the address and a few photos of the bank, ideally taken from the bayou side. We use them to draft a free preliminary estimate.