High Island is the exception on a flat coast. A large salt dome under the community lifts the ground to about 38 feet, making it the highest point on the Gulf coast between Mobile, Alabama and the Yucatan Peninsula. The unincorporated community sits at the eastern end of the Bolivar Peninsula, just inland from the Gulf of Mexico on the east side of Galveston Bay. In spring, birders come to its four Audubon sanctuaries.
Height on the dome does not shield structures built at the water line. When Hurricane Ike came through in 2008, High Island saw significant storm surge and winds up to 110 mph. State Highway 87 east of here has been closed since 1990, cutting road access to Sea Rim State Park. Anything set at the shore here should be designed for surge and waves, and grade changes between higher ground and the shore often need retaining walls.
Our Waterfront Project Services in High Island, TX cover bulkheads, seawalls and retaining walls, as well as piers, docks and boat slips set on marine pilings. We also take on repair and maintenance of existing structures that have aged or taken storm damage.
Send us the property location near High Island and a set of photos. Our answer will carry a free preliminary estimate for the High Island property.






More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


A large salt dome under the community pushes the ground up to about 38 feet. It is the highest point on the Gulf coast between Mobile and the Yucatan.
Not at the water line. Hurricane Ike still brought significant surge and winds up to 110 mph to High Island, so shoreline structures need full storm design.
Yes. Grade changes between higher ground and the shore are a common place for retaining walls, and we build them with drainage behind.
Yes. We build docks, piers and boat slips on driven pilings matched to the water depth and exposure at the site.
A location, a short description and photos of the site. With those, a free preliminary estimate for High Island work is on its way.