Three quarters of Seabrook is water. Of its roughly 21 square miles, about 15.9 are open water, because the city sits where Clear Lake meets Galveston Bay. Its listed elevation is 0 feet. A trail system runs from Hammer Street down to the bay at Pine Gully Park, and private boat docks sit along the shore.
When Hurricane Ike came ashore in 2008, surge flooded most homes and businesses east of Texas 146 in Seabrook and completely covered the highway north of the Kemah Bridge. Homes along Todville Road were washed away or gutted, and boats and dock debris ended up blocking streets. Bay-facing lots here take open fetch from Galveston Bay, while lots on Clear Lake tend to deal more with passing boat wake. Both loosen hardware over time, so a sound wall or dock starts with well-set pilings, through-bolted framing and a cap high enough to shed wave splash.
As Waterfront Contractors in Seabrook, TX, our crew builds bulkheads and seawalls, retaining walls, piers, docks and boat slips. We drive marine pilings and take on repair and maintenance for Seabrook bay and lake structures.
Email the Seabrook address with a few photos, ideally one from the water side. You will get a free preliminary estimate in return.






More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


Surge flooded most homes and businesses east of Texas 146, and houses along Todville Road were washed away or gutted. Boats and dock debris blocked streets afterward.
Often. Lots facing the lake deal more with boat wake, while bay lots take larger wind-driven waves, and both affect piling layout and deck height.
Yes. We remove or cap the failing wall as needed and build a new one with tiebacks sized for bay exposure.
We build boat slips and the pilings and framing that support them, sized to your boat and water depth.
The address, photos from land and water if possible, and a description of the work. We do not charge for the preliminary estimate.