Seadrift is a Calhoun County town of 995 people (2020 census) on the northeastern shore of San Antonio Bay. Commercial fishing, crabbing included, has long carried the local economy, and the town runs its own harbor with a harbormaster.
Hurricane Harvey strengthened to Category 4 before making landfall between Rockport and Seadrift in 2017. The harbor took a hard hit, the bayfront eroded, and boats were left sunk or smashed, some sitting in the roadway. By early 2024, about one third of the harbor had new bulkheading, riprap had gone in at the West End, and a breakwater at the Pine Street Extension was being built to keep sand from refilling the harbor after dredging. Those choices reflect the main pressures here: wave energy off the open bay, sediment that moves around, and storm surge. On private frontage, a wall needs toe protection against scour, and docks need pilings that will not loosen when the bottom shifts.
Shore Protect Team handles Waterfront Construction Services in Seadrift, TX covering bulkheads, seawalls, retaining walls, piers, docks and boat slips. We drive marine pilings and repair existing structures on San Antonio Bay frontage.
Message us the Seadrift location along with photos, and a free preliminary estimate will follow.






More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


Harvey made landfall between Rockport and Seadrift as a Category 4 storm. The harbor was hit hard, the bayfront eroded and many boats were wrecked.
Rock at the toe absorbs wave energy and limits scour, so the wall keeps its footing. The Seadrift harbor work included riprap at the West End.
Yes. Moving sand can reduce depth in a slip over time. We consider how the slip sits relative to the bay and plan piling depth with that in mind.
Yes. We build piers on pilings sized for the wave exposure at each Seadrift lot.
Send us the location and photos. We review them and send a free preliminary estimate, then arrange a site visit.