Around Riverside in Walker County, the Trinity River runs into the upper end of Lake Livingston. Piers here stand on river banks and shallow lake edges rather than open lake water.
Our pier construction and repair page covers materials, prices and completed projects.
The main load is flood water. After heavy rain upstream the Trinity rises quickly, carries logs and brush, and sets current against the piles. Sandy loam banks scour around posts that are too short.
We drive piles deep enough to stay firm after scour, set the deck above normal high water and brace the frame against current. Decking can be treated wood or composite.
Send photos of your bank and the spot where you want the pier for a free first estimate.

labor and materials
Pier construction in Riverside on the Trinity River and upper Lake Livingston using composite and pressure-treated materials, designed for recreational waterfront access where river floods, changing lake levels and sandy loam bank soils define pier piling requirements.

labor and materials
Pier repair in Riverside: replace flood-damaged pilings and decking on Trinity River properties, reinforce piling bases scoured by flood current, and restore dock connections weakened by periodic Trinity River flooding and sandy loam bank soil undercutting near Riverside in Walker County.


On river banks and shallow lake edges at the upper end of Lake Livingston.
Flood water after heavy rain upstream.
Current and debris.
Homes and fishing camps along the river.
Send a few photos of the shore for a free preliminary assessment.