Bay City is the seat of Matagorda County and sits on the lower Colorado River, upstream of Matagorda and the bay. River lots have banks of several feet down to the water.
Our pier services page covers materials, prices and completed projects.
The Colorado here carries current, floods after heavy rain upstream, and brings down logs and debris. A pier on the river has to resist that side load, and its piles need depth below the scour line.
Soils are clay and silt that turn soft when wet. We set piles deep, keep the deck high enough for normal floods and use hardware that can be inspected and tightened.
Shore Protect Team builds and repairs river piers and fishing platforms in Bay City. Send photos of the bank and the river at your lot for a free preliminary assessment.

labor and materials
Piers on the Colorado River in Bay City on deep piles braced for current and debris.

labor and materials
Pier repair in Bay City: scoured or leaning piles, broken decking and loose hardware.


Colorado River current, floods and floating debris push on the piles, so they need depth and bracing.
Above normal high water. We check flood marks at your lot before setting deck height.
Yes: leaning or scoured piles, broken decking and loose hardware.