On Possum Kingdom Lake, the right piling is a function of the structure, the soil, and the water. Treated wood handles most residential applications. Steel is specified for heavy commercial loads, deep water, or structures exposed to extreme strong wind fetch in open sections, recreational boat traffic, dam-controlled levels near Graford, Caddo, Mineral Wells, Palo Pinto.
Shore Protect Team installs wood and steel pilings along Possum Kingdom Lake using vibratory hammers, impact hammers, and jetting equipment — selecting the driving method based on limestone and sandstone bedrock conditions. Every piling is driven to refusal or engineered tip elevation, verified with blow count records.
Contact us for a free consultation on piling installation for your Possum Kingdom Lake waterfront project near Graford, Caddo, Mineral Wells, Palo Pinto.

labor and materials
Wood piling installation on Possum Kingdom Lake using CCA or creosote treated southern yellow pine driven into the lake's limestone and sandstone bedrock substrate. Piling diameter and length are engineered for each site based on soil bearing capacity, water depth, and structural loading from strong wind fetch in open sections, recreational boat traffic, dam-controlled levels.

labor and materials
Steel piling installation on Possum Kingdom Lake for heavy-load applications — commercial docks, marine structures, and bridge foundations. H-piles and pipe piles driven or jetted into limestone and sandstone bedrock to calculated depth. Corrosion protection systems matched to the lake's freshwater with exceptional clarity environment.


Wood pilings handle most residential applications on Possum Kingdom Lake — docks, piers, boardwalks and light bulkheads. Steel is specified for heavy commercial structures, deep-water applications, and situations where the limestone and sandstone bedrock substrate requires greater bearing capacity or the strong wind fetch in open sections, recreational boat traffic, dam-controlled levels generates extreme lateral loads.
Wood pilings on Possum Kingdom Lake start at $150 each for labor and materials. Steel pilings start at $200. Final cost depends on piling diameter, length, treatment, limestone and sandstone bedrock driving conditions, water depth, and equipment access.
Shore Protect Team uses vibratory hammers, impact hammers, and water-jetting equipment depending on the limestone and sandstone bedrock substrate. Barge-mounted equipment is used for deep-water installation; shore-based equipment handles shallow-water and upland piling work.
In some cases, yes. Sister pilings, concrete jackets, and steel sleeve wraps can extend the life of pilings that still have structural capacity. If the piling is broken, severely rotted below the waterline, or has lost bearing in limestone and sandstone bedrock, replacement is necessary.
Yes. Shore Protect Team handles all required coordination for piling installation on Possum Kingdom Lake, from site assessment through driving and verification. We serve properties near Graford, Caddo, Mineral Wells, Palo Pinto.