Lumberton is in southeastern Hardin County, about 10 miles north of Beaumont at the edge of the Big Thicket. Its eastern border is Village Creek, a tributary of the Neches River that flows southeast and is one of the few free-flowing creeks left in Texas. Village Creek State Park sits inside the city, with a canoe launch onto the Village Creek Paddling Trail.
Flooding is the main concern. Lumberton suffered heavy property damage in the Pine Island Bayou and Village Creek areas, and when Hurricane Harvey arrived on August 28, 2017, roughly half the community ended up underwater. A free-flowing creek has no dam upstream to hold back a rise, so water comes up with the rain and carries logs and debris with it. Structures on these lots should assume full submersion: piles long enough to resist scour, framing tied down so it does not float, and walls with drainage so the bank does not slump as the water goes down.
Count on us as your Marine Construction Company in Lumberton, TX for bank work with bulkheads, seawalls and retaining walls, for piers, docks and small boat slips on deep piling, and for repairs after the creek goes down.
For a quick start, text or email photos of your creek or bayou frontage with the address. From those we draw up a free preliminary price for the Lumberton job.






More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


It can be, if the dock is built for submersion. That means deep piles, tied-down framing and a layout that lets debris pass rather than catch.
A bulkhead or seawall at the waterline, sometimes with a retaining wall higher up, holds the soil in place. The right choice depends on bank height and how much current reaches it.
About half of Lumberton was submerged, so many docks and walls sat underwater with debris against them. Damage like that often shows up later as leaning piles and loose framing.
Yes. We check every pile and connection, replace damaged members and reset anything that shifted.
The address, photos of the bank and any current structure, and a few words about the goal. We then send a no-cost preliminary estimate for the Village Creek or bayou work.