East Bay is the long eastern arm of Galveston Bay in Chambers County, about 20 miles long and 5 miles wide on a northeast line. Bolivar Peninsula forms its entire south side, so bayside lots in Gilchrist and near Port Bolivar face it. Smith Point sits at the western end. To the east, Oyster Bayou winds about 23 miles through a wildlife refuge before reaching the bay, and East Bay Bayou and the Intracoastal Waterway meet it at the far tip.
Storm surge sets the design here. Hurricane Ike in 2008 pushed an estimated 15 to 17 feet of water over Bolivar Peninsula, and Gilchrist was swept away except for a few homes. Some houses on 14-foot stilts in Crystal Beach washed off. Around the bay, the Galveston Bay Foundation has used living shorelines and marsh restoration to slow erosion. Low marsh banks and long fetch call for walls with good toe rock and docks on long, well-braced pilings.
Our Erosion Control Services in East Bay, TX cover bulkheads, seawalls, retaining walls, marine pilings, piers, docks and boat slips, plus repair of existing structures on Bolivar and Smith Point lots.
Tell us where your East Bay frontage is and add photos. A free preliminary estimate goes back to you once we see them.





More about each service: Bulkheads, Seawalls, Retaining Walls, Piers, Docks & Boat Slips, Piling Installation, Waterfront Repair and Maintenance.


There is no single number. We look at your lot elevation and exposure to East Bay, then set deck height and bracing to limit storm damage.
Yes. We assess what is left of the piles, tiebacks and sheathing, then repair or replace the wall section by section.
A low seawall or rock toe in front of the marsh edge can slow wave cutting. We match the height to how much wave energy your shore gets.
Yes. Smith Point sits at the western end of East Bay, and we build piers, docks and walls suited to that open exposure.
Send your lot location on Bolivar or Smith Point and some photos. We work up a free preliminary estimate from them.