Bulkheads Construction and Repair in West & East Columbia, Texas

West & East Columbia Bulkheads Cost - Brazos River Waterfront Conditions and Starting Prices

Bank Protection on the Brazos River in West and East Columbia

West Columbia and East Columbia sit on opposite banks of the lower Brazos River in Brazoria County.

For the full list of materials and starting prices, see our bulkheads page.

The Brazos drains a huge basin, so floods can arrive days after rain upstream and stay high for a long time. Fast water cuts the clay at the bottom of the bank, and the top caves in.

A wall here needs deep embedment, rock at the toe and drainage behind it. On high banks we combine a bulkhead with a sloped section above.

Shore Protect Team LLC builds bulkheads and stabilizes banks in West and East Columbia. Send photos for a free assessment.

Wooden Bulkhead

Wooden Bulkheads

Cost Start at $150 per linear foot

labor and materials

Timber walls for West and East Columbia camps on quieter inside bends of the lower Brazos.

Vinyl Bulkhead

Vinyl Bulkheads

Cost Start at $200 per linear foot

labor and materials

Vinyl bulkheads for Brazos River homes in West Columbia, embedded deep with drainage behind for long floods.

Concrete Bulkhead

Concrete Bulkheads

Cost Start at $300 per linear foot

labor and materials

Concrete bulkheads combined with a sloped section above for high Brazos banks in East Columbia.

Rock Bulkheads

Stone and Boulder Bulkheads

Cost Start at $150 per linear foot

labor and materials

Rock at the toe of Brazos riverbanks in West and East Columbia, where fast water cuts the clay first.

Gabions Bulkhead

Gabion Bulkheads

Cost Start at $200 per linear foot

labor and materials

Gabion walls for caved Brazos banks near the Columbias, rebuilt in baskets that drain after high water.

Repair Bulkheads

Bulkhead Repair

Cost Start at $100 per linear foot

labor and materials

Repair of West and East Columbia bulkheads after Brazos floods like those of 2016 and Harvey.

Bulkheads Construction and Repair in West & East Columbia, Texas

Trust the Professionals!

Get a Free Consultation and Preliminary Cost Estimate
Bulkheads Construction and Repair in West & East Columbia, Texas

Frequently Asked Questions About Bulkheads Construction and Repair in West & East Columbia, TX

What river runs past Columbia?

The Brazos River.

What is the main risk?

Floods that arrive days after rain upstream.

Why do banks cave in?

Floods cut the clay at the bottom of the bank.

Do you stabilize banks?

Yes, with bulkheads and rock at the toe.

Close
Close
loading