West Columbia and East Columbia sit on opposite banks of the lower Brazos River in Brazoria County.
For the full list of materials and starting prices, see our bulkheads page.
The Brazos drains a huge basin, so floods can arrive days after rain upstream and stay high for a long time. Fast water cuts the clay at the bottom of the bank, and the top caves in.
A wall here needs deep embedment, rock at the toe and drainage behind it. On high banks we combine a bulkhead with a sloped section above.
Shore Protect Team LLC builds bulkheads and stabilizes banks in West and East Columbia. Send photos for a free assessment.

labor and materials
Timber walls for West and East Columbia camps on quieter inside bends of the lower Brazos.

labor and materials
Vinyl bulkheads for Brazos River homes in West Columbia, embedded deep with drainage behind for long floods.

labor and materials
Concrete bulkheads combined with a sloped section above for high Brazos banks in East Columbia.

labor and materials
Rock at the toe of Brazos riverbanks in West and East Columbia, where fast water cuts the clay first.

labor and materials
Gabion walls for caved Brazos banks near the Columbias, rebuilt in baskets that drain after high water.

labor and materials
Repair of West and East Columbia bulkheads after Brazos floods like those of 2016 and Harvey.


The Brazos River.
Floods that arrive days after rain upstream.
Floods cut the clay at the bottom of the bank.
Yes, with bulkheads and rock at the toe.