Nassau Bay is a small Harris County city on a triangular peninsula at the head of Clear Lake, across NASA Road 1 from Johnson Space Center. Water lines its west, south and east sides: Clear Creek, Clear Lake, Carlton Bayou and Swan Lagoon.
For the full list of materials and starting prices, see our bulkhead construction and repair page.
Most lots back onto the lake, the creek or a lagoon. The water is brackish and tidal, boat traffic on Clear Lake is heavy, and soft clay near the surface gives a wall little support. Hurricane Ike flooded much of the city in 2008.
We drive vinyl sheet pile deep into firm soil, tie it back with marine-grade anchors and add drainage so water does not build up behind the wall. Send photos for a free preliminary assessment.

labor and materials
Wood bulkheads for Nassau Bay canal lots, with treated lumber and marine-grade fittings for brackish Clear Lake water.

labor and materials
Vinyl bulkheads for Nassau Bay homes across NASA Parkway from Johnson Space Center, built for wake and surge on Clear Lake.

labor and materials
Concrete bulkheads for Nassau Bay lots that carry a dock, lift or heavy load right at the water.

labor and materials
Rock toe protection for Nassau Bay lakefront walls, which stops wake from scouring soil at the base.

labor and materials
Gabion edges for softer Nassau Bay shorelines where a flexible, draining wall fits better than panels.

labor and materials
Repair of Nassau Bay bulkheads: corroded tie-rods, separated panels and soil loss behind walls hit by Ike-type surge.


Yes. Many Nassau Bay homes sit on Clear Lake or on canals that lead to it, and a bulkhead with a dock or boat lift is a normal part of the property. Because the city is compact, most residential lots have water frontage of some kind.
Ike in 2008 flooded much of Nassau Bay and damaged bulkheads and docks across the area. Clear Lake connects to Galveston Bay, so it rises with storm surge, and walls here have to be anchored for surge as well as for everyday wake.
Clear Lake water is brackish, and salt slowly eats hardware that is not marine grade. Tie-rods and fasteners often fail before the wall panels do, which is why we use marine-grade fittings on every Nassau Bay wall.
Yes. Boat traffic to and from the bay keeps wake hitting the walls, and a lift keeps the boat out of that wake. We plan the wall, dock and lift together.
Send us photos of your shoreline for a free preliminary assessment.